British Gaskets
The project involved the construction of a new 24,000 sq foot warehouse and 4,000 sq foot associated two-storey office.
The main structure is a steel portal frame clad with a composite cladding material. The floor finish utilised a power floated floor incorporating a dry shake system to achieve a hardened highly polished effect.
The internal spaces include a mezzanine floor and materials were robust and practical with the offices flexible and bright.
![British Gaskets](https://www.sehfrench.co.uk/wp-content/uploads/2021/09/WKP-MSAP-British-Gaskets-9312-1024x683.jpg)
![British Gaskets Industrial](https://www.sehfrench.co.uk/wp-content/uploads/2021/08/WKP-MSAP-British-Gaskets-9296-1024x527.jpg)
- Client: British Gaskets
- Programme: 40 weeks
- Location: Sudbury, Suffolk
- Value: £1.3 million
- Architect: Wincer Kievenaar Architects